We’re so glad you chose White Castle Roofing to care for your home roofing needs. To help everything run more smoothly, we’ve put together some tips and information that will keep us all on the same page. Of course, if you ever have any questions or concerns, please don’t hesitate to reach out to us and we’ll get your questions answered and needs addressed right away.

We have a 4.9 Star Rating

40 Years in Business

Licensed, Bonded, & Insured

$1M+ In Free Roofs

Built With Trust, Proven By Time

You Have Scheduled Service With An Arrival Date, Now What?

Remove Valuable Items Like Photos / Vases Or Outdoor Items In Fall Range
remove art from walls

While we take care to protect your property, rare accidents do happen during the shingle drop-off and roofing process. Keeping your valuables out of the yard or off the walls can help take further steps to protect them.

Pull Your Car Out Of The Garage As Well As Clear The Driveway

cleared driveway
The container to dispose of your old shingles will generally be placed in your driveway early in the morning of your scheduled work, so having your car out of the garage will ensure you still have access to leave once the container has been delivered. It will be removed the next business day after your roof is completed.

Mow & Maintain The Yard Surrounding Your House

lawn mower

This will help during the clean-up process. As debris falls, whether large chunks or small nails, a well-kept yard ensures we can collect all trash at the end of the job and safely remove it.

Please Make Sure We Have Access To Power On The Outside Of The Home

electrical outlet

If an outlet is only available in the garage, please leave the door open, or provide an access code. If any inside switches need to be turned on to provide power to an outdoor outlet, please make sure they are on. If no power is available, please let us know in advance so that other preparations may be made to provide it.

residential reroofing service

1. Confirm Date & Time

The office will call to confirm your appointment details, like date and time, in preparation for your installation.

dumpster roll-off

2. Delivery Roll-Off

We will have a roll-off delivered to your home for all old shingles, debris, and trash.

metal roofing installation service

3. Shingles Delivered To Your Home

We will have the shingles delivered to your home before we arrive so they are ready to go the day we start re-roofing your property.

storm hail damage repair service

4. Tear-Off Process Begins

The first step once we arrive at your home is to begin removing your old shingles from the roof.

roof decking inspection

5. Roof Decking Inspection

After we have removed your old shingles, we inspect your roof decking and identify any areas that need to be replaced.

roofing felt

6. Install Underlayment Shielding

The next step is we begin laying down felt as well as the Ice & Water Shield.

roof metal flashing

7. Roof Metal Inspection & Replacement

Next we will replace any necessary metal edges or flashing to ensure a leak-free roof.

roof vent flashings

8. Installing New Valleys & Plumbing Boots

The next part we look at in terms of roof metal are the valleys and plumbing boots.

new roof shingles

9. New Shingles Are Installed

We can begin laying down and installing your new shingles on your home.

new ridge vent installation

10. Install Ridge Vent Or Roof Vents

We want to ensure your attic space has proper ventilation through adequate venting on your roof.

roll off cleanup container

11. Clean-Up Process Begins

We will begin the clean-up process, picking up all debris, trash, and other remnants left over from the re-roof process.

roof install quality check

12. Final Review & Quality Assurance Checks

Congratulations, you have a new roof! At this stage, we will ensure everything is complete and sign off on your newly installed roof.